Bid Solicitation: BD-24-1010-PROCU-CRIM-90172
|
Responses Due in 20 Days, 16 Hours, 41 Minutes
|
Header Information
|
Bid Number:
|
BD-24-1010-PROCU-CRIM-90172
|
Description:
|
RFB No. 28 (FY23)_Kelly Gym Funeral Services Renovations
|
Bid Opening Date:
|
07/17/2023 02:00:00 PM
|
Purchaser:
|
Nadine Rodriguez
|
Organization:
|
Bridgewater State University
|
Department:
|
PROCUREMENT - Procurement Services
|
Location:
|
CRIM - CRIM
|
Fiscal Year:
|
24
|
Type Code:
|
NS - Non-Statewide Solicitation
|
Allow Electronic Quote:
|
Yes
|
Alternate Id:
|
|
Required Date:
|
07/17/2023
|
Available Date
:
|
06/26/2023 12:00:00 AM
|
Info Contact:
|
|
Bid Type:
|
OPEN
|
Informal Bid Flag:
|
No
|
Purchase Method:
|
Open Market
|
Pre Bid Conference:
|
A pre-bid meeting will be held at the date, time and location specified in the bid documents. Bids documents may be located online at https://biddocs.com/bidding/dashboard/B23-5QJD
|
Bulletin Desc:
|
THIS PROJECT IS BEING ELECTRONICALLY BID AND NO HARD COPY BIDS WILL BE ACCEPTED.Bid Forms and Contract Documents are available on www.biddocsonline.com.
|
|
Ship-to Address:
|
Operations Center
200 Great Hill Drive
Bridgewater, MA 02325
US
Email: crim@bridgew.edu
Phone: (508)531-1362
|
Bill-to Address:
|
Jennifer Pacheco
131 Summer Street
Bridgewater, MA 02747
US
Email: ProcurementServices@Bridgew.edu
Phone: (508)531-1211
|
Print Format:
|
|
File Attachments:
|
Notice to Bidders
|
Form Attachments:
|
|
Required Quote Attachments
|
|
|
Item # 1:
(
30-10
-
00
)
|
This project consists the demolition, new plumbing, electrical, low voltage, lighting controls, HVAC, fire alarm work, new walls, doors, ceiling work, finishes, translucent panels, and louvers. - DCAMM Prime Category: General Building Construction, DCAMM Filed Sub-Bidder Categories: HVAC, Electrical Work
|
|
U N S P S C Code:
|
30-10-00
Structural materials and basic shapes
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 2:
(
25-17
-
00
)
|
This project consists the demolition, new plumbing, electrical, low voltage, lighting controls, HVAC, fire alarm work, new walls, doors, ceiling work, finishes, translucent panels, and louvers. - DCAMM Prime Category: General Building Construction, DCAMM Filed Sub-Bidder Categories: HVAC, Electrical Work
|
|
U N S P S C Code:
|
25-17-00
Transportation components and systems
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 3:
(
72-15
-
12
)
|
This project consists the demolition, new plumbing, electrical, low voltage, lighting controls, HVAC, fire alarm work, new walls, doors, ceiling work, finishes, translucent panels, and louvers. - DCAMM Prime Category: General Building Construction, DCAMM Filed Sub-Bidder Categories: HVAC, Electrical Work
|
|
U N S P S C Code:
|
72-15-12
Heating and cooling and air conditioning HVAC construction a
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
|
|
|
|