Bid Solicitation: BD-24-1530-SWSPD-SWSPD-101289
|
Responses Due in 17 Days, 19 Hours, 10 Minutes
|
Header Information
|
Bid Number:
|
BD-24-1530-SWSPD-SWSPD-101289
|
Description:
|
Bid No. 24-66 FY 24 Sewer Improvements Capital Project
|
Bid Opening Date:
|
05/01/2024 02:00:00 PM
|
Purchaser:
|
Sara Tetrault
|
Organization:
|
Springfield Water and Sewer Commission
|
Department:
|
SWSPD - Procurement Department
|
Location:
|
SWSPD - Procurement Department
|
Fiscal Year:
|
24
|
Type Code:
|
NS
|
Allow Electronic Quote:
|
Yes
|
Alternate Id:
|
|
Required Date:
|
|
Available Date
:
|
04/10/2024 12:00:00 AM
|
Info Contact:
|
|
Bid Type:
|
OPEN
|
Informal Bid Flag:
|
No
|
Purchase Method:
|
Open Market
|
Pre Bid Conference:
|
Bid Forms and Contract Documents will be available for pick-up at www.biddocsonline.com on April 10, 2024, online at www.biddocsonline.com
|
Bulletin Desc:
|
FY 24 Sewer Infrastructure Improvements. The Work includes but is limited Sewer pipe rehabilitation including replacement, structural lining, grout sealing, and CIPP or SIPP lining of the following estimated quantities:
? CIPP or SIPP of 268 feet of an existing 60-inch brick combined sewer pipe.
? CIPP lining of 2,735 feet vitrified clay pipe along with
? 1 excavate point repair.
? CIPP lining of 445 feet of a 12 inch.
? 505 feet of 15-inch concrete pipe.
|
|
Ship-to Address:
|
Theo Theocles
250 Main Street
Agawam, MA 01001
US
Email: theo.theocles@waterandsewer.org
Phone: (413)452-1326
|
Bill-to Address:
|
Theo Theocles
250 Main Street
Agawam, MA 01001
US
Email: theo.theocles@waterandsewer.org
Phone: (413)452-1326
|
Print Format:
|
|
File Attachments:
|
Bid No. 24-66 Legal Ad.pdf
|
Form Attachments:
|
|
Required Quote Attachments
|
|
|
Item # 1:
(
83-10
-
15
)
|
Bids for Prime/General Contractor will be accepted by the Chief Procurement Officer at the Springfield Water and Sewer Commission John J. Lyons Administration Building, 250 M Street Ext., Agawam, MA until 2:00PM EST on May 1, 2024, at which time they will be publicly opened and read.
FY 24 Sewer Infrastructure Improvements. The Work includes but is limited Sewer pipe rehabilitation including replacement, structural lining, grout sealing, and CIPP or SIPP lining of the following estimated quantities:
-CIPP or SIPP of 268 feet of an existing 60-inch brick combined sewer pipe
-CIPP lining of 2.735 feet vitrified clay pipe along with
-1 excavate point repair
-CIPP lining of 455 feet of a 12 inch
-505 feet of 15-inch concrete pipe
The Project is estimated not to exceed $1,451,000.00. No Pre-bid conference will be held for this project.
|
|
U N S P S C Code:
|
83-10-15
Water and sewer utilities
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
|
|
MASS_MASS_AWS_PROD_BUYSPEED_2_bso
|
|