Massachusetts Bids > Bid Detail

MBTA Arborway Bus Facility Crew Quarters

Agency: Commonwealth of Massachusetts
Level of Government: State & Local
Category:
  • 54 - Prefabricated Structures and Scaffolding
  • V - Transportation, Travel and Relocation Services
Opps ID: NBD14609934217100252
Posted Date: Apr 26, 2023
Due Date: May 25, 2023
Solicitation No: BD-23-1206-31100-31102-87817
Source: https://www.commbuys.com/bso/e...

Bid Solicitation: BD-23-1206-31100-31102-87817
Header Information
Bid Number:
BD-23-1206-31100-31102-87817
Description:
MBTA Arborway Bus Facility Crew Quarters
Bid Opening Date:
05/25/2023 02:00:00 PM
Purchaser:
ALLISON SWEENEY
Organization:
Massachusetts Bay Transportation Authority
Department:
311002 - Capital Delivery
Location:
31102 - Design and Construction
Fiscal Year:
23
Type Code:
NS - Non-Statewide Solicitation
Allow Electronic Quote:

No
Alternate Id:

Required Date:
Available Date
:
04/26/2023 09:00:00 AM
Info Contact: Bid Type:
OPEN
Informal Bid Flag:

No
Purchase Method:
Open Market
Pre Bid Conference:
A prebid conference will be held on May 11, 2023, at 2:00 p.m. as a virtual online meeting. Details regarding the pre-bid conference will be provided upon request of the specifications.
Bulletin Desc:
Work consists of the construction of a building for the occupancy and use of the MBTA staff at the Arborway Bus Maintenance Facility located at Washington Street and Arborway in Boston, near Forest Hills station. The building will be constructed immediately adjacent to the existing mobile trailers now in use. The building will be approximately 36 ft x 73 ft. Site work from excavation, pavement restoration, utility connections, and removal/demolition of the existing (triple-wide) crew quarters
Ship-to Address:
Design and Construction
10 Park Plaza
Suite 5170
Boston, MA 02116
US
Email: info@mbta.com
Phone: (617)222-5955
Bill-to Address:
MBTA
10 Park Plaza
Accounts PayableDepartment
Boston, MA 02116
US
Email: invoices@mbta.com
Phone: (617)222-3235
Print Format:
Bid Print
Required Quote Attachments
Item Information

Item # 1:

(

72-13

-
00

)



Work consists of the construction of a building for the occupancy and use of the MBTA staff at the Arborway Bus Maintenance Facility located at Washington Street and Arborway in Boston, near Forest Hills station. The building will be constructed immediately adjacent to the existing mobile trailers now in use. The building will be approximately 36 ft x 73 ft. Site work from excavation, pavement restoration, utility connections, and removal/demolition of the existing (triple-wide) crew quarters

U N S P S C Code:
72-13-00
General building construction

Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost

1.0




EA - Each














Manufacturer:

Brand:

Model:

Make:

Packaging:



Copyright © 2023 Periscope Holdings, Inc. - All Rights Reserved.


MASS_MASS_AWS_PROD_BUYSPEED_1_bso








TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >