Massachusetts Bids > Bid Detail

R08 BCEC CUP Pump Drives

Agency: Commonwealth of Massachusetts
Level of Government: State & Local
Category:
  • 25 - Vehicular Equipment Components
  • 43 - Pumps and Compressors
Opps ID: NBD14609896439512483
Posted Date: May 10, 2023
Due Date: Jun 7, 2023
Solicitation No: BD-19-1208-MCCA1-MCCA1-88406
Source: https://www.commbuys.com/bso/e...

Bid Solicitation: BD-19-1208-MCCA1-MCCA1-88406
Header Information
Bid Number:
BD-19-1208-MCCA1-MCCA1-88406
Description:
R08 BCEC CUP Pump Drives
Bid Opening Date:
06/07/2023 12:00:00 PM
Purchaser:
Indrit Metaj
Organization:
Massachusetts Convention Center Authority
Department:
MCCA1 - Legal
Location:
MCCA1 - BCEC
Fiscal Year:
19
Type Code:
NS - Non-Statewide Solicitation
Allow Electronic Quote:

No
Alternate Id:

Required Date:
Available Date
:
05/10/2023 12:00:00 AM
Info Contact: Bid Type:
OPEN
Informal Bid Flag:

No
Purchase Method:
Open Market
Pre Bid Conference:
The Pre-Bid Conference will occur 5/17/2023 @ 1pm on site at the BCEC at 415 Summer Street ,Boston, MA. Bidders will meet in the main lobby and have the opportunity to visit the site of the work
Bulletin Desc:
This project includes providing all labor, equipment, implements, and materials required to furnish and install all Electrical work (complete and operable) as shown on the drawings and as noted in specifications. The contractor
to also coordinate the installation of new software for this project and ensure that there is a seamless transition of the existing Electrical systems to the new one with no interruption in building operations

Ship-to Address:
T Ruane
415 Summer Street
Boston, MA 02210
US
Email: truane@massconvention.com
Phone: (617)954-2100
Bill-to Address:
T Ruane
415 Summer Street
Boston, MA 02210
US
Email: truane@massconvention.com
Phone: (617)954-2100
Print Format:
Bid Print
Required Quote Attachments
Item Information

Item # 1:

(

72-13

-
00

)



This project includes providing all labor, equipment, implements, and materials required to furnish and install all Electrical work (complete and operable) as shown on the drawings and as noted in specifications. The contractor
to also coordinate the installation of new software for this project and ensure that there is a seamless transition of the existing Electrical systems to the new one with no interruption in building operations


U N S P S C Code:
72-13-00
General building construction

Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost

1.0




EA - Each














Manufacturer:

Brand:

Model:

Make:

Packaging:



Copyright © 2023 Periscope Holdings, Inc. - All Rights Reserved.


MASS_MASS_AWS_PROD_BUYSPEED_2_bso








TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >