Massachusetts Bids > Bid Detail

Irving School Reconfiguration-Project No. 7268

Agency: Commonwealth of Massachusetts
Level of Government: State & Local
Category:
  • N - Installation of Equipment
  • Y - Construction of Structures and Facilities
Opps ID: NBD14609835853534427
Posted Date: Jun 13, 2023
Due Date: Jul 7, 2023
Solicitation No: BD-24-1142-PFD01-PFD01-89854
Source: https://www.commbuys.com/bso/e...

Bid Solicitation: BD-24-1142-PFD01-PFD01-89854
Header Information
Bid Number:
BD-24-1142-PFD01-PFD01-89854
Description:
Irving School Reconfiguration-Project No. 7268
Bid Opening Date:
07/07/2023 12:00:00 PM
Purchaser:
BID COUNTER
Organization:
City of Boston
Department:
PFD01 - Public Facilities Department
Location:
PFD01 - Public Facilities Department
Fiscal Year:
24
Type Code: Allow Electronic Quote:
Yes

Alternate Id:

Required Date:
Available Date
:
06/05/2023 09:00:00 AM
Info Contact:
bid.info@boston.gov
Bid Type:
OPEN
Informal Bid Flag:

No
Purchase Method:
Open Market
Pre Bid Conference:
Bulletin Desc:
The scope of work is further detailed in the specifications, reconfiguration of the Washington Irving School to accompany approximately 700 K-6th grade students.
Ship-to Address:
Anne Marie O'Sullivan
22 Drydock Ave. 3rd Floor
Boston, MA 02210
US
Email: bid.info@boston.gov
Phone: (617)635-4809
Bill-to Address:
PFD Bid Room
22 Drydock Ave. 3rd Floor
Boston, MA 02210
US
Email: bid.info@boston.gov
Phone: (617)635-4809
Print Format:
Bid Print

File Attachments:
Irving School Reconfiguration-Project No. 7258

Form Attachments:
Required Quote Attachments
Item Information
1-5 of 11

1
2

3


Item # 1:

(

72-15

-
19

)



The scope of work is further detailed in the specifications, reconfiguration of the Washington Irving School to accompany approximately 700 K-6th grade students.

U N S P S C Code:
72-15-19
Masonry and stonework services

Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost

0.1




EA - Each














Manufacturer:

Brand:

Model:

Make:

Packaging:



Item # 2:

(

72-15

-
11

)



The scope of work is further detailed in the specifications, reconfiguration of the Washington Irving School to accompany approximately 700 K-6th grade students.

U N S P S C Code:
72-15-11
Plumbing construction services

Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost

0.1




EA - Each














Manufacturer:

Brand:

Model:

Make:

Packaging:



Item # 3:

(

72-15

-
15

)



The scope of work is further detailed in the specifications, reconfiguration of the Washington Irving School to accompany approximately 700 K-6th grade students.

U N S P S C Code:
72-15-15
Electrical system services

Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost

0.1




EA - Each














Manufacturer:

Brand:

Model:

Make:

Packaging:



Item # 4:

(

72-15

-
19

)



The scope of work is further detailed in the specifications, reconfiguration of the Washington Irving School to accompany approximately 700 K-6th grade students.

U N S P S C Code:
72-15-19
Masonry and stonework services

Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost

0.1




EA - Each














Manufacturer:

Brand:

Model:

Make:

Packaging:



Item # 5:

(

72-15

-
21

)



The scope of work is further detailed in the specifications, reconfiguration of the Washington Irving School to accompany approximately 700 K-6th grade students.

U N S P S C Code:
72-15-21
Acoustical and insulation services

Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost

0.1




EA - Each














Manufacturer:

Brand:

Model:

Make:

Packaging:


1-5 of 11

1
2

3










Quote # Description Date Last Modified Status

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >