Bid Solicitation: BD-20-2080-FINA0-FIN02-98789
|
Header Information
|
Bid Number:
|
BD-20-2080-FINA0-FIN02-98789
|
Description:
|
RTU Replacement
|
Bid Opening Date:
|
03/29/2024 11:00:00 AM
|
Purchaser:
|
J Eric Boes
|
Organization:
|
Crest Collaborative
|
Department:
|
FINA01 - CB Finance
|
Location:
|
FIN02 - CB Procurement
|
Fiscal Year:
|
20
|
Type Code:
|
SS
|
Allow Electronic Quote:
|
Yes
|
Alternate Id:
|
|
Required Date:
|
03/29/2024
|
Available Date
:
|
02/28/2024 12:00:00 AM
|
Info Contact:
|
|
Bid Type:
|
OPEN
|
Informal Bid Flag:
|
No
|
Purchase Method:
|
Open Market
|
Pre Bid Conference:
|
Bid walkthrough at 20 Shattuck Road in Andover, MA 01810 on Thursday, March 7, 2024 at 11:00 AM
|
Bulletin Desc:
|
CREST Collaborative, 20 Shattuck Rd, Andover, MA 01810, the Awarding Authority, invites sealed bids for the CREST Collaborative RTU Replacement Project located at 20 Shattuck RD, Andover, MA 01810. The work is estimated to cost $1,150,000. Construction Schedule anticipated to start late August 2024 and substantially completed by early September 2024 depending on RTU lead time. Bids are subject to M.G.L. c.149 44A-J & to minimum wage rates as required by M.G.L. c.149 26 to 27H inclusive.
|
|
Ship-to Address:
|
J. Eric Boes
1 Branch Street
Methuen, MA 01844
US
Email: jeboes@crestcollaborative.org
Phone: (978)685-3000
|
Bill-to Address:
|
J. Eric Boes
1 Branch Street
Methuen, MA 01844
US
Email: jeboes@crestcollaborative.org
Phone: (978)685-3000
|
Print Format:
|
Bid Print
|
File Attachments:
|
CREST Collaborative RTU Replacement Projet
|
Form Attachments:
|
|
Required Quote Attachments
|
|
|
Item # 1:
(
72-15
-
12
)
|
CREST Collaborative, 20 Shattuck Rd, Andover, MA 01810, the Awarding Authority, invites sealed bids for the CREST Collaborative RTU Replacement Project located at 20 Shattuck RD, Andover, MA 01810. The work is estimated to cost $1,150,000. Construction Schedule anticipated to start late August 2024 and substantially completed by early September 2024 depending on RTU lead time. Bids are subject to M.G.L. c.149 44A-J & to minimum wage rates as required by M.G.L. c.149 26 to 27H inclusive.
|
|
U N S P S C Code:
|
72-15-12
Heating and cooling and air conditioning HVAC construction a
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
|
|
|
|