Bid Solicitation: BD-24-1271-CPO00-CPO-99574
|
Header Information
|
Bid Number:
|
BD-24-1271-CPO00-CPO-99574
|
Description:
|
Franklin Ridge Booster Pump Station
|
Bid Opening Date:
|
05/01/2024 09:00:00 AM
|
Purchaser:
|
Pamela Vickery
|
Organization:
|
Town of Franklin
|
Department:
|
CPO001 - Town of Franklin Purchasing Department
|
Location:
|
CPO - Town of Franklin
|
Fiscal Year:
|
24
|
Type Code:
|
NS - Non-Statewide Solicitation
|
Allow Electronic Quote:
|
No
|
Alternate Id:
|
|
Required Date:
|
|
Available Date
:
|
03/07/2024 05:22:52 PM
|
Info Contact:
|
|
Bid Type:
|
OPEN
|
Informal Bid Flag:
|
No
|
Purchase Method:
|
Open Market
|
Pre Bid Conference:
|
Optional Pre-Bid Meeting at 10:00 AM on April 2, 2024, Franklin Municipal Building, 355 East Central Street, Franklin, MA 02038, Room 201 - Council Chambers
|
Bulletin Desc:
|
In accordance with MGL c. 30 section 39m, it is the intention of the Town of Franklin to retain the services of a company for the Franklin Ridge Booster Pump Station Project in the Town of Franklin.
|
|
Ship-to Address:
|
Pam Vickery
355 East Central Street
Franklin, MA 02038
US
Email: pvickery@franklinma.gov
Phone: (508)520-4866
FAX: (508)541-5253
|
Bill-to Address:
|
Pam Vickery
355 East Central Street
Franklin, MA 02038
US
Email: pvickery@franklinma.gov
Phone: (508)520-4866
FAX: (508)541-5253
|
Print Format:
|
Bid Print
|
File Attachments:
|
Franklin Ridge Booster Pump Station
|
Form Attachments:
|
|
Required Quote Attachments
|
|
|
Item # 1:
(
72-13
-
17
)
|
The work to be performed will include the Construction of a prefabricated pump station building and internal equipment required to supply uninterrupted water service to the Bright Hill High Service Area (HSA), existing Eaton Place senior housing facility, proposed Franklin Ridge senior housing facility, and the future development at Lot No. 3. The new pump station building will be located at the corner of Veterans Memorial Drive and Panther Way. The project also includes the demolition of the existing Bright Hill Booster Pumping Station and other miscellaneous site improvements, stormwater infrastructure, and other ancillary construction items. Work under this Contract shall be paid for at the contract unit bid prices, which shall constitute full compensation for all material, labor, equipment, etc., required to satisfactorily complete the work.
|
|
U N S P S C Code:
|
72-13-17
Infrastructure construction
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
|
|
MASS_MASS_AWS_PROD_BUYSPEED_2_bso
|
|