Massachusetts Bids > Bid Detail

23-01 Island End River Flood

Agency: Commonwealth of Massachusetts
Level of Government: State & Local
Category:
  • 99 - Miscellaneous
  • Y - Construction of Structures and Facilities
Opps ID: NBD14609641880631424
Posted Date: May 3, 2023
Due Date: May 24, 2023
Solicitation No: BD-23-1147-COE25-COE25-88051
Source: https://www.commbuys.com/bso/e...

Bid Solicitation: BD-23-1147-COE25-COE25-88051
Header Information
Bid Number:
BD-23-1147-COE25-COE25-88051
Description:
23-01 Island End River Flood
Bid Opening Date:
05/24/2023 01:00:00 PM
Purchaser:
Allison Jenkins
Organization:
City of Everett
Department:
COE25 - DPW
Location:
COE25 - DPW
Fiscal Year:
23
Type Code:
NS - Non-Statewide Solicitation
Allow Electronic Quote:

No
Alternate Id:

Required Date:
Available Date
:
05/03/2023 09:00:00 AM
Info Contact: Bid Type:
OPEN
Informal Bid Flag:

No
Purchase Method:
Open Market
Pre Bid Conference:
None
Bulletin Desc:
The Cities of Chelsea and Everett propose to construct a coastal flood barrier, Storm Surge Control Facility, and related amenities at IER in the Cities of Chelsea and Everett (the ?Project Site?). The approximately 5.6-acre Project Site is currently comprised of a mix of commercial and industrial uses and supporting roadway and utility infrastructure. The proposed IER Flood Resilience Project (the ?Project?) will construct an approximately 4,640 linear-foot (?lf?) flood barrier,
Ship-to Address:
Allison Jenkins
City of Everett
484 Broadway
Room 14 - Purchasing
Everett, MA 02149
US
Email: allison.jenkins@ci.everett.ma.us
Phone: (617)394-2288
Website: https://cityofeverett.com
Bill-to Address:
Allison Jenkins
City of Everett
484 Broadway
Room 14 - Purchasing
Everett, MA 02149
US
Email: allison.jenkins@ci.everett.ma.us
Phone: (617)394-2288
Website: https://cityofeverett.com
Print Format:
Bid Print

File Attachments:
23-01 Newspaper Ad.docx

Form Attachments:
Required Quote Attachments
Item Information

Item # 1:

(

81-10

-
00

)



The Cities of Chelsea and Everett propose to construct a coastal flood barrier, Storm Surge Control Facility, and related amenities at IER in the Cities of Chelsea and Everett. The approximately 5.6-acre Project Site is currently comprised of a mix of commercial and industrial uses and supporting roadway and utility infrastructure. The proposed IER Flood Resilience Project will construct an approximately 4,640 linear-foot flood barrier, an approximately 2,900 square-foot underground Storm Surge Control Facility, approximately 50,000 square feet of nature-based solutions along the riverfront, and associated wetland and public access improvements along the IER.

U N S P S C Code:
81-10-00
Professional engineering services

Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost

1.0




EA - Each














Manufacturer:

Brand:

Model:

Make:

Packaging:



Copyright © 2023 Periscope Holdings, Inc. - All Rights Reserved.


MASS_MASS_AWS_PROD_BUYSPEED_1_bso








TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >