Bid Solicitation: BD-23-1147-COE25-COE25-88051
|
Header Information
|
Bid Number:
|
BD-23-1147-COE25-COE25-88051
|
Description:
|
23-01 Island End River Flood
|
Bid Opening Date:
|
05/24/2023 01:00:00 PM
|
Purchaser:
|
Allison Jenkins
|
Organization:
|
City of Everett
|
Department:
|
COE25 - DPW
|
Location:
|
COE25 - DPW
|
Fiscal Year:
|
23
|
Type Code:
|
NS - Non-Statewide Solicitation
|
Allow Electronic Quote:
|
No
|
Alternate Id:
|
|
Required Date:
|
|
Available Date
:
|
05/03/2023 09:00:00 AM
|
Info Contact:
|
|
Bid Type:
|
OPEN
|
Informal Bid Flag:
|
No
|
Purchase Method:
|
Open Market
|
Pre Bid Conference:
|
None
|
Bulletin Desc:
|
The Cities of Chelsea and Everett propose to construct a coastal flood barrier, Storm Surge Control Facility, and related amenities at IER in the Cities of Chelsea and Everett (the ?Project Site?). The approximately 5.6-acre Project Site is currently comprised of a mix of commercial and industrial uses and supporting roadway and utility infrastructure. The proposed IER Flood Resilience Project (the ?Project?) will construct an approximately 4,640 linear-foot (?lf?) flood barrier,
|
|
Ship-to Address:
|
Allison Jenkins
City of Everett
484 Broadway
Room 14 - Purchasing
Everett, MA 02149
US
Email: allison.jenkins@ci.everett.ma.us
Phone: (617)394-2288
Website: https://cityofeverett.com
|
Bill-to Address:
|
Allison Jenkins
City of Everett
484 Broadway
Room 14 - Purchasing
Everett, MA 02149
US
Email: allison.jenkins@ci.everett.ma.us
Phone: (617)394-2288
Website: https://cityofeverett.com
|
Print Format:
|
Bid Print
|
File Attachments:
|
23-01 Newspaper Ad.docx
|
Form Attachments:
|
|
Required Quote Attachments
|
|
|
Item # 1:
(
81-10
-
00
)
|
The Cities of Chelsea and Everett propose to construct a coastal flood barrier, Storm Surge Control Facility, and related amenities at IER in the Cities of Chelsea and Everett. The approximately 5.6-acre Project Site is currently comprised of a mix of commercial and industrial uses and supporting roadway and utility infrastructure. The proposed IER Flood Resilience Project will construct an approximately 4,640 linear-foot flood barrier, an approximately 2,900 square-foot underground Storm Surge Control Facility, approximately 50,000 square feet of nature-based solutions along the riverfront, and associated wetland and public access improvements along the IER.
|
|
U N S P S C Code:
|
81-10-00
Professional engineering services
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
|
|
Copyright © 2023 Periscope Holdings, Inc. - All Rights Reserved.
MASS_MASS_AWS_PROD_BUYSPEED_1_bso
|
|