Bid Solicitation: BD-24-1429-TABOS-TABOS-97750
|
Header Information
|
Bid Number:
|
BD-24-1429-TABOS-TABOS-97750
|
Description:
|
Track and Field Complex, Medway High School
|
Bid Opening Date:
|
02/16/2024 02:00:00 PM
|
Purchaser:
|
Allison Potter
|
Organization:
|
Town of Medway
|
Department:
|
TABOS - Town Administrator
|
Location:
|
TABOS - Town Administrator
|
Fiscal Year:
|
24
|
Type Code:
|
NS
|
Allow Electronic Quote:
|
No
|
Alternate Id:
|
|
Required Date:
|
|
Available Date
:
|
01/31/2024 02:00:00 PM
|
Info Contact:
|
www.westongraphics.com
|
Bid Type:
|
OPEN
|
Informal Bid Flag:
|
No
|
Purchase Method:
|
Open Market
|
Pre Bid Conference:
|
2/7/24, 10AM
at Hanlon Track & Field Complex, Medway High School, 88 Summer St, Medway, MA 02053
|
Bulletin Desc:
|
Hanlon Track & Field Complex reconstruction, Medway High School; project includes synthetic turf replacement at stadium field, reconstructed track, associated improvements. Sealed bids for the general contract must be filed with Town of Medway, DPW Office, Medway Middle School, 45B Holliston St, Door 9, Medway, MA, no later than 2/16/24, 2PM. Bid document available at Westongraphics.com after 2PM on 1/31/24. The Select Board awards the contract.
|
|
Ship-to Address:
|
A Potter
155 Village Street
Medway, MA 02053
US
Email: ta@townofmedway.org
Phone: (508)533-3264
FAX: (508)321-4988
|
Bill-to Address:
|
A Potter
155 Village Street
Medway, MA 02053
US
Email: ta@townofmedway.org
Phone: (508)533-3264
FAX: (508)321-4988
|
Print Format:
|
Bid Print
|
Required Quote Attachments
|
|
|
Item # 1:
(
72-15
-
31
)
|
IFB for Hanlon Track & Field Complex reconstruction, Medway High School; project includes synthetic turf replacement at stadium field, reconstructed track, and associated improvements. Sealed bids for the general contract must be filed with Town of Medway, DPW Office, Medway Middle School, 45B Holliston St, Door 9, Medway, MA, no later than 2/16/24, 2PM. Bid document available at Westongraphics.com after 2PM on 1/31/24. Tentative construction dates: start 6/3/24 with substantial completion by 9/20/24, final completion 10/4/24. The Select Board awards the contract.
|
|
U N S P S C Code:
|
72-15-31
Athletic and recreational facility construction services
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
|
|
MASS_MASS_AWS_PROD_BUYSPEED_2_bso
|
|