Bid Solicitation: BD-17-1489-PHA03-PHA03-98532
|
Header Information
|
Bid Number:
|
BD-17-1489-PHA03-PHA03-98532
|
Description:
|
HP Shower Upgrades
|
Bid Opening Date:
|
02/29/2024 02:00:00 PM
|
Purchaser:
|
Greg McGowan
|
Organization:
|
Plymouth Housing Authority
|
Department:
|
PHA03 - Modernization
|
Location:
|
PHA03 - Modernization
|
Fiscal Year:
|
17
|
Type Code:
|
NS
|
Allow Electronic Quote:
|
No
|
Alternate Id:
|
|
Required Date:
|
02/29/2024
|
Available Date
:
|
02/15/2024 10:12:01 AM
|
Info Contact:
|
Greg McGowan: gmcgowan@plymha.org 508-746-2105
|
Bid Type:
|
OPEN
|
Informal Bid Flag:
|
No
|
Purchase Method:
|
Open Market
|
Pre Bid Conference:
|
|
Bulletin Desc:
|
Demo two handicap showers down to stud (walls), install moisture resistant wall board, install two new acrylic shower systems plus hardware
|
|
Ship-to Address:
|
Chris Plourde
130 Court Street
Plymouth, MA 02360
US
Email: cplourde@plymha.org
Phone: (508)746-2105
FAX: (508)746-9229
|
Bill-to Address:
|
Chris Plourde
130 Court Street
Plymouth, MA 02360
US
Email: cplourde@plymha.org
Phone: (508)746-2105
FAX: (508)746-9229
|
Print Format:
|
Bid Print
|
Required Quote Attachments
|
|
|
Item # 1:
(
72-13
-
00
)
|
The Plymouth Housing Authority, the Awarding Authority, invites written quotes from Contractors for the
Housing Type: 059 Development for the Plymouth Housing Authority in Plymouth Massachusetts, in
accordance with the documents prepared by Plymouth Housing Authority.
The Project consists of: Demo two (2) existing handicap showers down to stud (just walls) and replace
with two (2) new seamless acrylic roll-in shower systems.
The work is estimated to cost 15,000.00 dollars
Quotes are subject to M.G.L. c.149 44A (2)(B) & to state prevailing wage rates or federal Davis-Bacon
wage rates as required by M.G.L. c.l49 26 to 27H inclusive. Whichever wage rate is higher to be used.
Written Quotes will be received until 2:00 p.m., Thursday February 29, 2024.
All Quotes should be delivered to: 130 Court St., Plymouth, MA. 02360 or emailed to Gregory McGowan
at gmcgowan@plymha.org and received no later than the date & time specified above. Quotes may be
hand delivered, mailed, or emailed.
Contract Documents will be available at:
130 Court St., Plymouth, MA. 02360 or can be requested by emailing Gregory McGowan at
gmcgowan@plymha.org
Contractors requesting Contract Documents to be mailed to them shall include a separate check for $20.00
per set, payable to the Awarding Authority, to cover mail handling costs.
The job site and/or existing building will be available for inspection by appointment only
For an appointment call Gregory McGowan at 508-746-2105, x401.
|
|
U N S P S C Code:
|
72-13-00
General building construction
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
|
|
|
|