Bid Solicitation: BD-23-2147-AWD02-AWD-83464
|
Responses Due in 37 Days, 14 Hours, 29 Minutes
|
Header Information
|
Bid Number:
|
BD-23-2147-AWD02-AWD-83464
|
Description:
|
North Acton Water Treatment Plant SUEZ PFAS Treatment Upgrade
|
Bid Opening Date:
|
03/02/2023 11:00:00 AM
|
Purchaser:
|
Matthew Mostoller
|
Organization:
|
Water Supply District of Acton
|
Department:
|
AWD02 - Acton Water District
|
Location:
|
AWD - Acton Water District
|
Fiscal Year:
|
23
|
Type Code:
|
SS
|
Allow Electronic Quote:
|
Yes
|
Alternate Id:
|
|
Required Date:
|
|
Available Date
:
|
01/18/2023 12:00:00 AM
|
Info Contact:
|
|
Bid Type:
|
OPEN
|
Informal Bid Flag:
|
No
|
Purchase Method:
|
Open Market
|
Pre Bid Conference:
|
A pre-bid conference for the Project will be held on Tuesday, January 31st, 2023, at 10:00 AM at the North Acton WTP, 960 Main Street, Acton, MA 01720. Attendance at the pre-bid conference is encouraged but not required.
|
Bulletin Desc:
|
Information and Bidding Documents for the Project may be downloaded at no cost at the following designated website:
https://www.wright-pierce.com/projects
|
|
Ship-to Address:
|
Christopher Allen
693 Massachusetts Avenue
PO Box 953
Acton, MA 01720
US
Email: chris@actonwater.com
Phone: (978)263-9107
FAX: (978)264-0148
|
Bill-to Address:
|
Christopher Allen
693 Massachusetts Avenue
PO Box 953
Acton, MA 01720
US
Email: chris@actonwater.com
Phone: (978)263-9107
FAX: (978)264-0148
|
Print Format:
|
|
Required Quote Attachments
|
|
|
Item # 1:
(
72-13
-
17
)
|
Constructing the North Acton Water Treatment Plant SUEZ PFAS Treatment Upgrade. It shall be located at 960 Main Street in Acton, MA, at the existing North Acton Water Treatment Plant site. The project shall include installation of a process transfer pumping system, PFAS equalization tank, two PFAS treatment containers (provided by others), interior process piping, site piping, and ancillary equipment and controls. The work shall also include all site restoration and miscellaneous work and cleanup necessary to provide a complete and fully operational water treatment plant following the upgrades. The time for substantial completion of this contract is 300 calendar days and final completion is 365 calendar days.
|
|
U N S P S C Code:
|
72-13-17
Infrastructure construction
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
|
|
Copyright © 2023 Periscope Holdings, Inc. - All Rights Reserved.
MASS_MASS_AWS_PROD_BUYSPEED_2_bso
|
|