Bid Solicitation: BD-24-1769-EVEHA-EHAMO-97788
|
Header Information
|
Bid Number:
|
BD-24-1769-EVEHA-EHAMO-97788
|
Description:
|
Replace water supply riser control / drain valves (gate) and hot water recirculation valves.
|
Bid Opening Date:
|
02/22/2024 02:00:00 PM
|
Purchaser:
|
Stephen Kergo
|
Organization:
|
Everett Housing Authority
|
Department:
|
EVEHA - Everett Housing Authority
|
Location:
|
EHAMO - Main Office
|
Fiscal Year:
|
24
|
Type Code:
|
SS
|
Allow Electronic Quote:
|
Yes
|
Alternate Id:
|
|
Required Date:
|
02/22/2024
|
Available Date
:
|
02/01/2024 12:00:00 AM
|
Info Contact:
|
|
Bid Type:
|
OPEN
|
Informal Bid Flag:
|
No
|
Purchase Method:
|
Open Market
|
Pre Bid Conference:
|
Date and Time: 02/15/2024 at 10:00AM EST Address: 381 Ferry Street, Everett, MA 02149 Instructions: Do not park in tenant spaces.
|
Bulletin Desc:
|
EHA, the Awarding Authority, invites sealed bids from Contractors for the Replace water supply riser control / drain valves (gate) and hot water recirculation valves at State Aided Development: Glendale Towers (667-2) Everett, Mass, in accordance with the documents prepared by C.A. CROWLEY ENGINEERING, INC..
The work is estimated to cost $140,898.00. PROJECT IS BEING ELECTRONICALLY BID AND HARD COPY BIDS WILL
NOT BE ACCEPTED.
|
|
Ship-to Address:
|
Stephen Kergo
393 Ferry Street
Everett, MA 02149
US
Email: skergo.eha@comcast.net
Phone: (617)387-6389
FAX: (617)389-4936
|
Bill-to Address:
|
Stephen Kergo
393 Ferry Street
Everett, MA 02149
US
Email: skergo.eha@comcast.net
Phone: (617)387-6389
FAX: (617)389-4936
|
Print Format:
|
Bid Print
|
File Attachments:
|
Ad
|
Form Attachments:
|
|
Required Quote Attachments
|
|
|
Item # 1:
(
72-13
-
00
)
|
EVERETT HOUSING AUTHORITY, the Awarding Authority, invites sealed bids from Contractors for the Replace water supply riser control / drain valves (gate) and hot water recirculation valves at State Aided Development: Glendale Towers (667-2) in Everett, Massachusetts, in accordance with the documents prepared by C.A. CROWLEY ENGINEERING, INC..
The Project consists of but not limited to:
Replace water supply riser control / drain valves (gate) and hot water recirculation valves. The work is estimated to cost $140,898.00.
|
|
U N S P S C Code:
|
72-13-00
General building construction
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
|
|
|
|