Header Information
|
Bid Number:
|
BD-23-1432-ARLTN-ARLTN-87142
|
Description:
|
FPE Panel Upgrade
|
Bid Opening Date:
|
05/04/2023 11:00:00 AM
|
Purchaser:
|
Chris Partridge
|
Organization:
|
Arlington Housing Authority
|
Department:
|
ARLTN - Arlington Housing Authority
|
Location:
|
ARLTN - Arlington Housing Authority
|
Fiscal Year:
|
23
|
Type Code:
|
|
Allow Electronic Quote:
|
Yes
|
Alternate Id:
|
|
Required Date:
|
|
Available Date
:
|
04/17/2023 12:00:00 AM
|
Info Contact:
|
|
Bid Type:
|
OPEN
|
Informal Bid Flag:
|
No
|
Purchase Method:
|
Open Market
|
Pre Bid Conference:
|
PRE-BID CONFERENCE / SITE VISIT:
Date and Time: Tuesday, 18 April 2023 at 10:00 AM Address: 54 Medford Street, Arlington
Instructions: bring mask and business card for attendance
|
Bulletin Desc:
|
The Arlington Housing Authority, the Awarding Authority, invites sealed bids from Contractors for the 667-2 FPE Panel Replacement and Switchboard Modernization, #010113 in Arlington, Massachusetts, in accordance with the documents prepared by OWL Engineers.
The Project consists of: Replace 2600A, 120/208V switchboard interior and (80) FPE unit load centers. Asbestos abatement is included and emergency generator to power entire building while service is upgraded is also included.
|
|
Ship-to Address:
|
Chris Partridge
4 Winslow Street
Arlington, MA 02474
US
Email: cpartridge@arlingtonhousing.org
Phone: (781)539-3879
|
Bill-to Address:
|
Chris Partridge
4 Winslow Street
Arlington, MA 02474
US
Email: cpartridge@arlingtonhousing.org
Phone: (781)539-3879
|
Print Format:
|
Bid Print
|
File Attachments:
|
AHAFPE.docx
|
Form Attachments:
|
|
Required Quote Attachments
|
|