Bid Solicitation: BD-23-1142-PFD01-PFD01-87605
|
Header Information
|
Bid Number:
|
BD-23-1142-PFD01-PFD01-87605
|
Description:
|
Frontage Road-Project No. 7269
|
Bid Opening Date:
|
04/27/2023 12:00:00 PM
|
Purchaser:
|
BID COUNTER
|
Organization:
|
City of Boston
|
Department:
|
PFD01 - Public Facilities Department
|
Location:
|
PFD01 - Public Facilities Department
|
Fiscal Year:
|
23
|
Type Code:
|
NS - Non-Statewide Solicitation
|
Allow Electronic Quote:
|
Yes
|
Alternate Id:
|
|
Required Date:
|
|
Available Date
:
|
04/10/2023 12:00:00 PM
|
Info Contact:
|
|
Bid Type:
|
OPEN
|
Informal Bid Flag:
|
No
|
Purchase Method:
|
Open Market
|
Pre Bid Conference:
|
|
Bulletin Desc:
|
400 Frontage Road Central Maintenance Facility needs replacement of three rooftop HVAC units that are in poor condition in order to provide the building with air conditioning during warm weather. Further detailed in the plans and specifications.
|
|
Ship-to Address:
|
Anne Marie O'Sullivan
22 Drydock Ave. 3rd Floor
Boston, MA 02210
US
Email: bid.info@boston.gov
Phone: (617)635-4809
|
Bill-to Address:
|
PFD Bid Room
22 Drydock Ave. 3rd Floor
Boston, MA 02210
US
Email: bid.info@boston.gov
Phone: (617)635-4809
|
Print Format:
|
Bid Print
|
File Attachments:
|
400 Frontage Road-Ch. 149
|
Form Attachments:
|
|
Required Quote Attachments
|
|
|
Item # 1:
(
72-13
-
00
)
|
The scope of work includes 400 Frontage Road Central Maintenance Facility needs replacement of three
rooftop HVAC units that are in poor condition in order to provide the building with air conditioning during
warm weather. The roof where these three units are located, along with one heating unit that is in process to be
replaced through emergency work with PFD, needs to be replaced as it is a rubber roof in poor condition which
leaks throughout the building.
|
|
U N S P S C Code:
|
72-13-00
General building construction
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Tax Rate
|
Tax Amount
|
Total Cost
|
0.1
|
|
EA - Each
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 2:
(
72-10
-
22
)
|
The scope of work includes 400 Frontage Road Central Maintenance Facility needs replacement of three
rooftop HVAC units that are in poor condition in order to provide the building with air conditioning during
warm weather. The roof where these three units are located, along with one heating unit that is in process to be
replaced through emergency work with PFD, needs to be replaced as it is a rubber roof in poor condition which
leaks throughout the building.
|
|
U N S P S C Code:
|
72-10-22
Electrical services
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Tax Rate
|
Tax Amount
|
Total Cost
|
0.1
|
|
EA - Each
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 3:
(
72-10
-
23
)
|
The scope of work includes 400 Frontage Road Central Maintenance Facility needs replacement of three
rooftop HVAC units that are in poor condition in order to provide the building with air conditioning during
warm weather. The roof where these three units are located, along with one heating unit that is in process to be
replaced through emergency work with PFD, needs to be replaced as it is a rubber roof in poor condition which
leaks throughout the building.
|
|
U N S P S C Code:
|
72-10-23
Plumbing and heating and air conditioning
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Tax Rate
|
Tax Amount
|
Total Cost
|
0.1
|
|
EA - Each
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 4:
(
72-10
-
16
)
|
The scope of work includes 400 Frontage Road Central Maintenance Facility needs replacement of three
rooftop HVAC units that are in poor condition in order to provide the building with air conditioning during
warm weather. The roof where these three units are located, along with one heating unit that is in process to be
replaced through emergency work with PFD, needs to be replaced as it is a rubber roof in poor condition which
leaks throughout the building.
|
|
U N S P S C Code:
|
72-10-16
Roofing and siding and sheet metal work
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Tax Rate
|
Tax Amount
|
Total Cost
|
0.1
|
|
EA - Each
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 5:
(
72-10
-
00
)
|
The scope of work includes 400 Frontage Road Central Maintenance Facility needs replacement of three
rooftop HVAC units that are in poor condition in order to provide the building with air conditioning during
warm weather. The roof where these three units are located, along with one heating unit that is in process to be
replaced through emergency work with PFD, needs to be replaced as it is a rubber roof in poor condition which
leaks throughout the building.
|
|
U N S P S C Code:
|
72-10-00
Building construction and support and maintenance and repair
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Tax Rate
|
Tax Amount
|
Total Cost
|
0.1
|
|
EA - Each
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
|
|