Massachusetts Bids > Bid Detail

Frontage Road-Project No. 7269

Agency: Commonwealth of Massachusetts
Level of Government: State & Local
Category:
  • C - Architect and Engineering Services - Construction
  • Y - Construction of Structures and Facilities
Opps ID: NBD14609095978686400
Posted Date: Apr 20, 2023
Due Date: May 3, 2023
Solicitation No: BD-23-1142-PFD01-PFD01-87606
Source: https://www.commbuys.com/bso/e...

Bid Solicitation: BD-23-1142-PFD01-PFD01-87606
Header Information
Bid Number:
BD-23-1142-PFD01-PFD01-87606
Description:
Frontage Road-Project No. 7269
Bid Opening Date:
05/03/2023 12:00:00 PM
Purchaser:
BID COUNTER
Organization:
City of Boston
Department:
PFD01 - Public Facilities Department
Location:
PFD01 - Public Facilities Department
Fiscal Year:
23
Type Code:
NS - Non-Statewide Solicitation
Allow Electronic Quote:
Yes

Alternate Id:

Required Date:
Available Date
:
04/17/2023 09:00:00 AM
Info Contact: Bid Type:
OPEN
Informal Bid Flag:

No
Purchase Method:
Open Market
Pre Bid Conference:
Bulletin Desc:
Renovations to an existing middle school. The building is being converted into a K-8. Work will include reconfiguration of classrooms, interior finishes, HVAC , new fire protection system, upgrading electrical, site work & Drainage, roofing, new elevator; further detailed in the plans and specs.
Ship-to Address:
Anne Marie O'Sullivan
22 Drydock Ave. 3rd Floor
Boston, MA 02210
US
Email: bid.info@boston.gov
Phone: (617)635-4809
Bill-to Address:
PFD Bid Room
22 Drydock Ave. 3rd Floor
Boston, MA 02210
US
Email: bid.info@boston.gov
Phone: (617)635-4809
Print Format:
Bid Print

File Attachments:
400 Frontage Road-Ch. 149

Form Attachments:
Required Quote Attachments
Item Information

Item # 1:

(

72-13

-
00

)



The scope of work includes 400 Frontage Road Central Maintenance Facility needs replacement of three
rooftop HVAC units that are in poor condition in order to provide the building with air conditioning during
warm weather. The roof where these three units are located, along with one heating unit that is in process to be
replaced through emergency work with PFD, needs to be replaced as it is a rubber roof in poor condition which
leaks throughout the building.

U N S P S C Code:
72-13-00
General building construction

Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost

0.1




EA - Each














Manufacturer:

Brand:

Model:

Make:

Packaging:



Item # 2:

(

72-10

-
22

)



The scope of work includes 400 Frontage Road Central Maintenance Facility needs replacement of three
rooftop HVAC units that are in poor condition in order to provide the building with air conditioning during
warm weather. The roof where these three units are located, along with one heating unit that is in process to be
replaced through emergency work with PFD, needs to be replaced as it is a rubber roof in poor condition which
leaks throughout the building.

U N S P S C Code:
72-10-22
Electrical services

Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost

0.1




EA - Each














Manufacturer:

Brand:

Model:

Make:

Packaging:



Item # 3:

(

72-10

-
23

)



The scope of work includes 400 Frontage Road Central Maintenance Facility needs replacement of three
rooftop HVAC units that are in poor condition in order to provide the building with air conditioning during
warm weather. The roof where these three units are located, along with one heating unit that is in process to be
replaced through emergency work with PFD, needs to be replaced as it is a rubber roof in poor condition which
leaks throughout the building.

U N S P S C Code:
72-10-23
Plumbing and heating and air conditioning

Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost

0.1




EA - Each














Manufacturer:

Brand:

Model:

Make:

Packaging:



Item # 4:

(

72-10

-
16

)



The scope of work includes 400 Frontage Road Central Maintenance Facility needs replacement of three
rooftop HVAC units that are in poor condition in order to provide the building with air conditioning during
warm weather. The roof where these three units are located, along with one heating unit that is in process to be
replaced through emergency work with PFD, needs to be replaced as it is a rubber roof in poor condition which
leaks throughout the building.

U N S P S C Code:
72-10-16
Roofing and siding and sheet metal work

Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost

0.1




EA - Each














Manufacturer:

Brand:

Model:

Make:

Packaging:



Item # 5:

(

72-10

-
00

)



The scope of work includes 400 Frontage Road Central Maintenance Facility needs replacement of three
rooftop HVAC units that are in poor condition in order to provide the building with air conditioning during
warm weather. The roof where these three units are located, along with one heating unit that is in process to be
replaced through emergency work with PFD, needs to be replaced as it is a rubber roof in poor condition which
leaks throughout the building.

U N S P S C Code:
72-10-00
Building construction and support and maintenance and repair

Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost

0.1




EA - Each














Manufacturer:

Brand:

Model:

Make:

Packaging:



Copyright © 2023 Periscope Holdings, Inc. - All Rights Reserved.


MASS_MASS_AWS_PROD_BUYSPEED_1_bso








TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >