Bid Solicitation: BD-24-1607-MAINT-MAINT-95720
|
Header Information
|
Bid Number:
|
BD-24-1607-MAINT-MAINT-95720
|
Description:
|
Federal Pacific Breaker Panel and main switch replacment
|
Bid Opening Date:
|
01/12/2024 10:00:00 AM
|
Purchaser:
|
Sharif Omer
|
Organization:
|
Waltham Housing Authority
|
Department:
|
MAINT - Maintenance
|
Location:
|
MAINT - Maintenance
|
Fiscal Year:
|
24
|
Type Code:
|
SS
|
Allow Electronic Quote:
|
Yes
|
Alternate Id:
|
|
Required Date:
|
01/12/2024
|
Available Date
:
|
12/06/2023 08:00:00 AM
|
Info Contact:
|
|
Bid Type:
|
OPEN
|
Informal Bid Flag:
|
No
|
Purchase Method:
|
Open Market
|
Pre Bid Conference:
|
Dec. 13, 2023 refer to Bid Docs Ad
|
Bulletin Desc:
|
Waltham Housing authority is seeking Qualified Bids for the replacement of Federal Pacific Panels and main switch for the Orange Street 667-4 Elderly development, located at 82-86 Orange Street, Waltham, MA 02451. The proposed scope includes replacing (32) 100A apartment load centers, (5) 100A panels, (2) 400A distribution boards, (1) 1200A distribution board, and (1) 800A main switch. The contractor shall be responsible for proper removal and disposal of wall joint compound containing greater t
|
|
Ship-to Address:
|
Mark Johnson
110 Pond St
Waltham, MA 02451
US
Email: markj@walhouse.org
Phone: (781)899-6363
FAX: (781)894-7595
|
Bill-to Address:
|
Mark Johnson
110 Pond Street
Waltham, MA 02451
US
Email: markj@walhouse.org
Phone: (781)894-3357
FAX: (781)894-7595
|
Print Format:
|
Bid Print
|
File Attachments:
|
Federal Pacific Panel, Breaker and Electrical Replacement
|
Form Attachments:
|
|
Required Quote Attachments
|
|
|
Item # 1:
(
72-13
-
00
)
|
Advertisement:-
Estimated Cost of Contract: 908,981.79
Waltham Housing authority is seeking Qualified Bids for the replacement of Federal Pacific Panels and main switch for the Orange Street 667.4 Elderly development, located at 82.86 Orange Street, Waltham, MA 02451. The proposed scope includes replacing 32 100A apartment load centers, 5- 100A panels, 2- 400A distribution boards, 1- 1200A distribution board, and 1-800A main switch. The contractor shall be responsible for proper removal and disposal of wall joint compound containing greater than 2 percent asbestos containing materials as required to facilitate system replacements on site. There will be an optional bidders conference held on December 13 2023, t 1000am for interested parties.
|
|
U N S P S C Code:
|
72-13-00
General building construction
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
|
|
MASS_MASS_AWS_PROD_BUYSPEED_2_bso
|
|