The purpose of the Work of this Contract is to stabilize the existing right (southern) bank of the North
Nashua River at 230 Commercial Road, Leominster, MA. The Site is on property owned by the City of
Leominster and is located east of the wastewater treatment plant and north of the Leominster Connector
road. A portion of the riverbank is exposed and is eroding to the south toward the 36-inch Fall Brook
Sewer Interceptor which transports approximately 25% of the City of Leominster sewage to the
wastewater treatment plant. The proposed Project will stabilize the exposed riverbank and minimize
future erosion and migration of the riverbank to the south.