Bid Solicitation: BD-21-1576-TYN01-TYN01-83012
|
Header Information
|
Bid Number:
|
BD-21-1576-TYN01-TYN01-83012
|
Description:
|
Trade Qualification Invitation
|
Bid Opening Date:
|
02/10/2023 04:00:00 PM
|
Purchaser:
|
Colin Loiselle
|
Organization:
|
Town of Tyngsborough
|
Department:
|
TYN01 - Town Administration
|
Location:
|
TYN01 - Town Administration
|
Fiscal Year:
|
21
|
Type Code:
|
NS
|
Allow Electronic Quote:
|
Yes
|
Alternate Id:
|
|
Required Date:
|
01/11/2023
|
Available Date
:
|
01/11/2023 08:00:00 AM
|
Info Contact:
|
|
Bid Type:
|
CLOSED
|
Informal Bid Flag:
|
No
|
Purchase Method:
|
Open Market
|
Pre Bid Conference:
|
|
Bulletin Desc:
|
The Tyngsborough Middle School Building Committee is seeking trade contractor qualifications for various categories of work in the construction of the new Tyngsborough Middle School at 50 Norris Road, Tyngsborough MA 01879.
|
|
Ship-to Address:
|
Matthew Hanson, Assistant Town Administrator
25 Bryants Lane
Tyngsborough, MA 01879
US
Email: mhanson@tyngsboroughma.gov
Phone: (978)649-2300 Ext. 1
FAX: (978)649-2320
|
Bill-to Address:
|
Matthew Hanson, Assistant Town Administrator
25 Bryants Lane
Tyngsborough, MA 01879
US
Email: mhanson@tyngsboroughma.gov
Phone: (978)649-2300 Ext. 1
FAX: (978)649-2320
|
Print Format:
|
Bid Print
|
File Attachments:
|
Project Description & Solicitation
|
Form Attachments:
|
|
Required Quote Attachments
|
|
|
Item # 1:
(
30-13
-
00
)
|
Acoustical Tile ($1m); Electrical ($8.3m); Elevators ($220k); Fire Protection/Sprinkler Systems ($1.1m); Glass and Glazing ($150k); HVAC ($8.6m); Masonry ($3m); Metal Windows ($2.1m); Misc. and Ornamental Iron ($790k); Painting ($470k); Plumbing ($3m); Resilient Floors ($710k); Roofing & Flashing ($3.5m); Tile ($120k); Waterproofing, Damproofing and Caulking ($475k)
|
|
U N S P S C Code:
|
30-13-00
Structural building products
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 2:
(
31-21
-
00
)
|
Acoustical Tile ($1m); Electrical ($8.3m); Elevators ($220k); Fire Protection/Sprinkler Systems ($1.1m); Glass and Glazing ($150k); HVAC ($8.6m); Masonry ($3m); Metal Windows ($2.1m); Misc. and Ornamental Iron ($790k); Painting ($470k); Plumbing ($3m); Resilient Floors ($710k); Roofing & Flashing ($3.5m); Tile ($120k); Waterproofing, Damproofing and Caulking ($475k)
|
|
U N S P S C Code:
|
31-21-00
Paints and primers and finishes
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 3:
(
39-12
-
00
)
|
Acoustical Tile ($1m); Electrical ($8.3m); Elevators ($220k); Fire Protection/Sprinkler Systems ($1.1m); Glass and Glazing ($150k); HVAC ($8.6m); Masonry ($3m); Metal Windows ($2.1m); Misc. and Ornamental Iron ($790k); Painting ($470k); Plumbing ($3m); Resilient Floors ($710k); Roofing & Flashing ($3.5m); Tile ($120k); Waterproofing, Damproofing and Caulking ($475k)
|
|
U N S P S C Code:
|
39-12-00
Electrical equipment and components and supplies
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 4:
(
52-10
-
00
)
|
Acoustical Tile ($1m); Electrical ($8.3m); Elevators ($220k); Fire Protection/Sprinkler Systems ($1.1m); Glass and Glazing ($150k); HVAC ($8.6m); Masonry ($3m); Metal Windows ($2.1m); Misc. and Ornamental Iron ($790k); Painting ($470k); Plumbing ($3m); Resilient Floors ($710k); Roofing & Flashing ($3.5m); Tile ($120k); Waterproofing, Damproofing and Caulking ($475k)
|
|
U N S P S C Code:
|
52-10-00
Floor coverings
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 5:
(
30-16
-
00
)
|
Acoustical Tile ($1m); Electrical ($8.3m); Elevators ($220k); Fire Protection/Sprinkler Systems ($1.1m); Glass and Glazing ($150k); HVAC ($8.6m); Masonry ($3m); Metal Windows ($2.1m); Misc. and Ornamental Iron ($790k); Painting ($470k); Plumbing ($3m); Resilient Floors ($710k); Roofing & Flashing ($3.5m); Tile ($120k); Waterproofing, Damproofing and Caulking ($475k)
|
|
U N S P S C Code:
|
30-16-00
Interior finishing materials
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
|
|
|
Copyright © 2023 Periscope Holdings, Inc. - All Rights Reserved.
MASS_MASS_AWS_PROD_BUYSPEED_2_bso
|
|