Bid Solicitation: BD-23-1142-PFD01-PFD01-84112
|
Header Information
|
Bid Number:
|
BD-23-1142-PFD01-PFD01-84112
|
Description:
|
Dorchester Community Center
|
Bid Opening Date:
|
02/21/2023 12:00:00 PM
|
Purchaser:
|
BID COUNTER
|
Organization:
|
City of Boston
|
Department:
|
PFD01 - Public Facilities Department
|
Location:
|
PFD01 - Public Facilities Department
|
Fiscal Year:
|
23
|
Type Code:
|
NS - Non-Statewide Solicitation
|
Allow Electronic Quote:
|
Yes
|
Alternate Id:
|
|
Required Date:
|
|
Available Date
:
|
01/30/2023 09:00:00 AM
|
Info Contact:
|
bid.info@boston.gov
|
Bid Type:
|
OPEN
|
Informal Bid Flag:
|
No
|
Purchase Method:
|
Open Market
|
Pre Bid Conference:
|
|
Bulletin Desc:
|
The scope of work includes development of Chapter 149 construction documents and construction administrative services.
Design team must include electrical, mechanical, fire safety, plumbing, civil, structural engineers, landscape architect, code consultant,cost estimator, specification writer acoustics, security, telecommunications and audio visual, food service consultant,
environmental engineer, elevator specialists, aquatics engineer, geotechnical engineer, sustainable design specialist and
|
|
Ship-to Address:
|
Anne Marie O'Sullivan
22 Drydock Ave. 3rd Floor
Boston, MA 02210
US
Email: bid.info@boston.gov
Phone: (617)635-4809
|
Bill-to Address:
|
PFD Bid Room
22 Drydock Ave. 3rd Floor
Boston, MA 02210
US
Email: bid.info@boston.gov
Phone: (617)635-4809
|
Print Format:
|
Bid Print
|
File Attachments:
|
Dorchester Community Center-Project No. 7291Ad
|
Form Attachments:
|
|
Required Quote Attachments
|
|
|
Item # 1:
(
72-15
-
15
)
|
The scope of work includes development of Chapter 149 construction documents and construction administrative services.
Design team must include electrical, mechanical, fire safety, plumbing, civil, structural engineers, landscape architect, code consultant,
cost estimator, specification writer acoustics, security, telecommunications and audio visual, food service consultant,
environmental engineer, elevator specialists, aquatics engineer, geotechnical engineer, sustainable design specialist and furniture
and equipment specialists.
|
|
U N S P S C Code:
|
72-15-15
Electrical system services
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Tax Rate
|
Tax Amount
|
Total Cost
|
0.1
|
|
EA - Each
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 2:
(
72-10
-
23
)
|
The scope of work includes development of Chapter 149 construction documents and construction administrative services.
Design team must include electrical, mechanical, fire safety, plumbing, civil, structural engineers, landscape architect, code consultant,
cost estimator, specification writer acoustics, security, telecommunications and audio visual, food service consultant,
environmental engineer, elevator specialists, aquatics engineer, geotechnical engineer, sustainable design specialist and furniture
and equipment specialists.
|
|
U N S P S C Code:
|
72-10-23
Plumbing and heating and air conditioning
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Tax Rate
|
Tax Amount
|
Total Cost
|
0.1
|
|
EA - Each
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 3:
(
72-15
-
29
)
|
The scope of work includes development of Chapter 149 construction documents and construction administrative services.
Design team must include electrical, mechanical, fire safety, plumbing, civil, structural engineers, landscape architect, code consultant,
cost estimator, specification writer acoustics, security, telecommunications and audio visual, food service consultant,
environmental engineer, elevator specialists, aquatics engineer, geotechnical engineer, sustainable design specialist and furniture
and equipment specialists.
|
|
U N S P S C Code:
|
72-15-29
Structural steel erection services
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Tax Rate
|
Tax Amount
|
Total Cost
|
0.1
|
|
EA - Each
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 4:
(
72-13
-
00
)
|
The scope of work includes development of Chapter 149 construction documents and construction administrative services.
Design team must include electrical, mechanical, fire safety, plumbing, civil, structural engineers, landscape architect, code consultant,
cost estimator, specification writer acoustics, security, telecommunications and audio visual, food service consultant,
environmental engineer, elevator specialists, aquatics engineer, geotechnical engineer, sustainable design specialist and furniture
and equipment specialists.
|
|
U N S P S C Code:
|
72-13-00
General building construction
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Tax Rate
|
Tax Amount
|
Total Cost
|
0.1
|
|
EA - Each
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 5:
(
72-10
-
00
)
|
The scope of work includes development of Chapter 149 construction documents and construction administrative services.
Design team must include electrical, mechanical, fire safety, plumbing, civil, structural engineers, landscape architect, code consultant,
cost estimator, specification writer acoustics, security, telecommunications and audio visual, food service consultant,
environmental engineer, elevator specialists, aquatics engineer, geotechnical engineer, sustainable design specialist and furniture
and equipment specialists.
|
|
U N S P S C Code:
|
72-10-00
Building construction and support and maintenance and repair
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Tax Rate
|
Tax Amount
|
Total Cost
|
0.1
|
|
EA - Each
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
|
|
|
Copyright © 2023 Periscope Holdings, Inc. - All Rights Reserved.
MASS_MASS_AWS_PROD_BUYSPEED_1_bso
|
|